Capability & Capacity
Everything behind your product, in one place
Plant, machines, finishing, quality and delivery: the numbers that show we can develop your product, build it right and keep it in supply.

At a glance
Capacity in numbers
Equipment
What's on the floor
Engineering
| SolidWorks 2025 & AutoCAD Mechanical | Design, unfolding and CAM |
|---|---|
| Siemens Sinumerik 840D | CNC control, integrated with the turret punch |
Shearing
| JEKSON CNC hydraulic shear | 60" × 120–144", up to 6 mm, 45 kg/mm² |
|---|
Punching
| Finn-Power E5 CNC turret | 20 stations, 200 kN, up to 8 mm, ±0.1 mm, 600 hits/min |
|---|
Forming
| Accurpress STM-PRESS-02 (×2) | 100 ton, 3.2 m bed |
|---|---|
| MB Jigson MBJPB8025 | 100 ton, 2.5 m bed |
| Yawei PBB-80/2550 | 80 ton, 2.55 m bed |
| Hindustan Hydraulics EHP25 servo hybrid (×2) | 25.5 ton, 1.25 m bed |
Welding
| CO₂ / MIG welding (×7) | Structural and seam welding |
|---|---|
| Arc welding stations (×2) | Thick sections and reinforcement |
| Stationary spot welders (×3) | 40 kA, up to 6 mm |
Finishing
| 12-tank pretreatment line | Air-agitated, phosphate |
|---|---|
| Powder coating booth | Auto/manual back-to-back, reciprocators, mono-cyclone recovery |
| LPG curing oven | 200–220 °C, U-loop conveyor |
Quality & design validation
The product you approve is the product you get
Design ownership & control
We can take ownership of the design for your product, or build to yours. Either way, documents are under strict revision control and every new product goes through First Article Inspection before production scales up. Consigned materials are tracked for full traceability.
Purchasing control
ERP-driven MRP, numbered and revision-controlled purchase orders, documented contract review and a formal supplier approval process.
Inspection & testing
Every part is inspected before packing. Gauges are calibrated by accredited laboratories or in-house, and lot results are recorded for traceability.
Corrective & preventive action
A preventive system catches issues before they reach production; a corrective system closes out internal and customer problems.
Process control
Work instructions, routings and job travellers track every order, and performance metrics are reviewed to cut lead times.
Environment
RoHS-compliant materials, energy management, controlled waste handling and powder recovery on the coating line.
Quality system summary
Documented, certified, audited
| Quality system | ISO 9001:2015, certified by TÜV |
|---|---|
| Environmental | GreenCo rated · RoHS-compliant materials |
| On request | Organisation chart, quality manual, control plan |
| Incoming inspection | Mandatory for suppliers not yet qualified dock-to-stock |
| In-process inspection | First-piece inspection at each operation |
| Final inspection | Before packing and shipment |
| Operations | Two shifts, 6 days a week (8 am – 8 pm and 8 pm – 12:30 am) |
| Logistics | Two company trucks |
Certifications

ISO 9001:2015 (TÜV): our quality management system consistently meets customer and regulatory requirements.
GreenCo: a green-company rating for environmental performance in manufacturing, covering energy, waste and resource use.
Copies of certificates are available on request.






